Rushing to complete some major renovation before this sat.
As I did not engage a main contractor, a lot of coordination work.
Felt a bit crazy, come to thing of it.
The floor is 99% done
Electrical work 90% done but disappointed over
the quality of the work
I feel like using $%^%^& to scold the electrician
Starting the painting
Air-con still not done
Kitchen sink and table top not done
I trust in God's provision
Everything will be okay by this Sat or Sunday
As I did not engage a main contractor, a lot of coordination work.
Felt a bit crazy, come to thing of it.
The floor is 99% done
Electrical work 90% done but disappointed over
the quality of the work
I feel like using $%^%^& to scold the electrician
Starting the painting
Air-con still not done
Kitchen sink and table top not done
I trust in God's provision
Everything will be okay by this Sat or Sunday
1 comment:
Love it
Post a Comment